• 33/11kV Substations / Baghdad :
Contract Ref.: M1 PH4331-621297-IND
Contractor: Schneider-Electric/France
Contract Cost: 616,000 USD
Duration: 14 months (Nov. 2004-Jan 2006)
Scope of Work: Al-Noor provided a team of experts to supervise the erection of 14 no. 33/11 kV substations including all civil and mechanical works in Rasafa/Bagdad.
•Rehabilitation of Units 5&6 of Daura Power Station/Baghdad:
Contract Ref.: R 24910-30B-CSU-M000-106
Contractor: Bechtel Int. Sys. Inc.
Contract Cost: 4,250,000 USD
Duration: 18 months (2003 - 2005)
Scope of Work: Bechtel Int. Sys. awarded Al-Noor Co. with United Co. (on a joint venture basis) the rehabilitation and maintenance of units 5&6 gas turbines of Daura Power
Station / Baghdad , carrying more than 350 task orders.
•Rustamiya & Sharq Dijla HT Network / Baghdad :
Contract Ref.: 24910-60B-SSU-MWBO
Contractor: Bechtel Int Sys.Inc.
Contract Cost: 3,693,313 USD
Duration ; 14 months (Nov. 2003 -Feb.2005)
Scope of Work : Procurement of switchgears , HT & LT cables , transformers and 3 no. 2MVA ,11kV standby generators plus installation and testing of incoming 11kV distribution board, RMU's, 11no. 0.4kV transformer and 3no. 2MVA,11kV generators and finally all related civil works including the generators building.
• Nasriya/Khor Al-Zubair 400kV Transmission Line / Basra :
Contract Ref. : 24910-305-ESU-EZLO-009
Contractor: Bechtel Int.Sys. Inc.
Contract Cost: 12,500,000 USD
Duration: 6 months (2004)
Scope of Work: Al-Noor , Ozdil of Turkey and KEC of India were working on a joint venture basis with Al-Noor to the rehabilitation and restoration of Nasriya /Khor Al-Zubair 400kV overhead transmission line with a total length of 200 km.
| |
|
|
|
|
|