:::Rehabilitation of PS2 & PS4 Stations/Iraq: :::

Contracts Ref. : 39-07-3173-01-BS, 39-07-3174-01-BS,39-07-3177-01-BS & 39-07-3178-01-BS
Contracts Cost: 54,440,000 Euro
Duration: 18 months
Main Contractor: Al- Noor Industrial Contracting Co.
Affiliated Contractors: Baghdad Company for Gas Turbine,GE Energy, GE Oil & Gas,
Client: Ministry of Oil/ South Oil Company


Scope of Work:

PS2, Pumping Station No.2 is located at Samawa and comprises two turbo pumps for oil pumping and four turbo compressors for gas pumping while PS4, Pumping Station No.4 which is located at Habaniyah comprises two turbo pumps for oil pumping. Both of these stations are part of the "Strategic Pipeline" which originates at Basra and ends at Al-Qaim at the Syrian boarders. The two pump stations were destructed and looted during the Gulf War. The work involves two main tasks:

  • Rehabilitation of the existing sets of gas turbine and turbo compressors at PS2 & PS4.

  • Supply & installation of DCS , MCC's , UPS's ,DC panels & Instrumentations and MOV's with all interconnecting cabling,airconditioning and fir fighting systems