::: Contracts History ::: |
Contract/Location |
Contractor |
Duration /Year |
Scope of Work |
|
|
South Power Station / Baghdad |
GE International Inc. |
2 months
2005
|
Testing and commissioning of 132kV outdoor switchyard, 6.6 switchgear and power transformers. |
|
Rasafa Area/Baghdad |
Schneider Electric |
14 months |
Supervision of the erection of 14 no. 33/11 kV substations including civil and mechanical works. |
|
Daura Power Station/Baghdad |
ABB |
6 months |
132 kV switch yard including civil structure works, installation of 14 bays comprising C.B's, CT's, VT's, surge arresters with all controls then testing and commissioning. |
|
Adamiya District Elect. Network Rehabilitation / Baghdad |
Directorate of Baghdad Electricity |
18 months
2003
|
Survey , design, procurement, installation and commissioning of a new underground network to serve almost 14,000 consumers using kiosk S/S ,HT cables ,LT cables and twisted cables. After completion of the design, the contract had been terminated because of the 2003 war. |
|
Daura Power Station/Baghdad |
Bechtel Int. Sys. Inc. |
3 months
2003
|
Rehabilitation and testing of a 50MVA transformer which was damaged because of penetrated fragments. |
|
Adamiya 132/33kV Substation /Baghdad |
Ministry of Industry |
3 months
2002
|
Erection of out door steel structure and busbars, installation of 33kV and control cables, then commissioning of 132kV (10 bays) substation. |
|
Qanal & Ataifiya WTP/Baghdad |
Ministry of Industry |
4 months
2002
|
Provisioning of equipment and rehabilitation of several water treatment plants and pumping stations. |
|
Sheik Omer Clinic/Baghdad |
United Nation (UNOPS) |
5 months
2000 |
Rehabilitation of civil, electrical and airconditioning system. |
|
Taj Sheba Hotel /Yemen |
Waycon Company |
8 months
1998
|
Maintenance , provisioning and erection of all electro-mechanical system of the 5 star hotel. |
|
UN Headquarters/Baghdad |
United Nation |
36 months
1997 |
Electro-mechanical maintenance contract. |
|
Taiz-Aden Power Llink /Yemen |
Ansoldo Company |
36 months
1996 |
With the cooperation of Ansoldo Co. of Italy ,Al-noor completed Taiz -Aden power link project of 400/132/33/11kV GIS and conventional type distribution S/S. |
|
Sharq Dijla Transmission Line /Baghdad |
Ministry of Industry |
12 months
1995 |
Installation of 33kV TL, 250-1000kVA kiosks complete with LT distribution network . |
|
Rafidain Bank/ Kerbala Governorate |
Ministry of Finance |
12 months 1993 |
Design and construction of 4 story building including basement. |
|
132/33/11 kV Substation /Diyala Governorate |
Ministry of Industry |
7 months
1989
|
Erection and commissioning of 2x63MVA capacity substation. |
|