:::Um Qasr 132/33/11 kV GIS Substation / Basra / Iraq :::
Contract Ref.: W91GXY-06-C-0037
Contractor: Al-Noor Contracting Company Int. Ltd.
Beneficiary: VATECH Siemens / PCO.
Contract Cost: 1,024,813 USD
Duration: 6.5 months (July 2006- Jan. 2007)
Scope of Work:
The scope of work covers dismantling,modifications,supervision, quality assurance and quality control, erection,testing and commissioning of Um Qasr 132/33/11kV GIS Substation. The work involves but not limited to:
Dismantling:
- Old Energoinvest 132kV GIS switchgear.
- Old 33kV and 11kV switchgears and associated equipment.
- Control, protection and metering panels.
- Switchyard and gantry equipment.
- One of the auxiliary transformers.
- Removal of 132kV, 33kV and 11kV power cables and accessories.
- Removal of all LV power and control cables.
- All auxiliary systems and components except for the main transformers and capacitor banks.
Rehabilitation / Servicing and Modifications:
- Main power transformers, auxiliary transformers and capacitor banks.
- Communications / RTU system.
- Buildings civil works.
Installation:
- One full set of VATECH / Siemens 132kV GIS equipment consisting of 4 line bays, 3 transformer bays and one coupling bay with their
associated local control cubicles and cables connections to the GIS.
- Installation of Schneider and Siemens 33kV & 11kV metal clad cubicles with their associated AIS busbars.
- Control, protection relays and metering panels.
- AC / DC and auxiliary systems and panels.
- 33kV & 11kV cable laying and terminations.
- LV power and control cable laying and terminations.
Testing and Commissioning:
- All individual systems.
- Power transformers.
- Communications / RTU system.
- Overall substation testing and commissioning.
Others:
- As built drawings and necessary documentations including operation and maintenance manuals.
- Site training of Customer's personnel.
| |
|
|
|
|
|